One-Third Down on a $48,000 Kitchen

The contract was three pages, printed at a copy shop, and it looked good. A new B license, a kitchen remodel in a 1970s ranch, and a homeowner who liked the plan. The contract price was $48,000. Near the bottom, under “Payment,” it said: “One-third due at signing. One-third at cabinet install. Balance at completion.”

The contractor had written it that way on purpose. For years he had run framing crews as a subcontractor on new houses, where builders paid draws on a schedule and nobody blinked at big numbers. He needed custom cabinets ordered before demolition. The cabinet shop wanted half up front. A third at signing covered that and then some.

The homeowner was seventy-one. Her son lived in Sacramento and read contracts for a living. He read this one on a Sunday night, opened the CSLB website on his laptop, and called his mother. “Don’t sign this yet.”

Nobody in this story was trying to cheat anybody. The contractor just brought commercial habits into a home improvement contract. In California, those are different rules. This post walks through what went wrong on that page, what the law says instead, and the legal ways to pay for cabinets before the wall comes down.

Carpenter in a tool belt using an air nailer on the trim above a front doorway
A carpenter trims out a front door on a home repair job. Photo: FEMA (public domain)

The short version, if you stop reading here

On a California home improvement contract, three money rules do most of the work.

  • The down payment is capped. It can be no more than $1,000 or 10 percent of the contract amount, whichever is less. On a $48,000 kitchen, 10 percent is $4,800, so the cap is $1,000.
  • Every other early payment has to be earned. Apart from the down payment, a contractor may not ask for or take payment that exceeds the value of the work performed or material delivered.
  • The schedule is written in dollars and cents. If there are payments before completion, the contract lists them, each tied to the specific work or materials it pays for.

There is one big exception. A contractor who furnishes a performance and payment bond, a lien and completion bond, or a bond equivalent or joint control approved by the Registrar, covering full performance and payment, is exempt from those three rules. That route has its own requirements, covered below.

If the contractor in our story had known those lines, the contract would have been rewritten before the son ever saw it.

Where these rules live

The home improvement rules are in the Business and Professions Code, mostly in Sections 7159 and 7159.5. Section 7159 lists what a home improvement contract has to contain. Section 7159.5 sets the money rules, the bond exemption, and the penalties.

A “home improvement contract” under Section 7159 is an agreement, oral or written, between a contractor and an owner or tenant for a home improvement, when the total price for labor, services, and materials is more than $500. A kitchen remodel in someone’s house is the plainest example there is.

Section 7159.5 says it applies to all home improvement contracts between an owner or tenant and a contractor, general or specialty, who is licensed or required to be licensed. So a C-36 plumber repiping a house and a B contractor redoing a kitchen are under the same money rules when the job is home improvement.

On the CSLB Law and Business exam, this material falls under the board’s “Contract Requirements and Execution” section. The board’s study guide lists it as one of seven sections on the exam. It is not trivia. It is the paperwork you will be writing on every residential job.

Line one: “One-third due at signing”

Start with the down payment, because that is the line the son circled.

Section 7159.5(a)(3) says it simply. If a down payment will be charged, it shall not exceed $1,000 or 10 percent of the contract amount, whichever is less.

Run the numbers on the kitchen. One-third of $48,000 is $16,000. Ten percent is $4,800. The lesser of $1,000 and $4,800 is $1,000. So the most this contractor could take at signing, without the bond exemption, was $1,000. He had written $16,000.

The cap moves with small jobs. On a $6,000 bathroom vanity and tile job, 10 percent is $600, and $600 is less than $1,000. So the cap there is $600. On any job of $10,000 or more, the cap is $1,000 flat.

The contract also has to say this out loud. Section 7159(d)(8) requires a heading, “Downpayment,” a space showing the actual amount, and this statement in at least 12-point boldface type:

“THE DOWNPAYMENT MAY NOT EXCEED $1,000 OR 10 PERCENT OF THE CONTRACT PRICE, WHICHEVER IS LESS.”

So the homeowner is told the rule on the same page where the contractor writes the number. That is part of why the son caught it so fast. If the form had been a proper home improvement contract, the statement would have been sitting right next to the $16,000.

Line two: “One-third at cabinet install”

The second payment is more interesting. A lot of people assume that once the down payment rule is met, everything after it is up to the parties. It is not.

Section 7159.5(a)(5) says that, except for a down payment, the contractor shall neither request nor accept payment that exceeds the value of the work performed or material delivered. The same paragraph says the rule also covers advance payment from a lender or financier. You cannot get around it by having the finance company pay you early.

So “one-third at cabinet install” might be fine. It might not. It depends on whether $16,000 is the value of what is done and delivered when the cabinets go in. If demo, rough plumbing, rough electrical, drywall, and the cabinets add up to $16,000 or more at that point, the payment can be earned. If they add up to $11,000, it cannot.

That is why Section 7159.5(a)(4) and Section 7159(d)(9) require a schedule. If there are payments before the work is finished, other than the down payment, the contract has to include a “Schedule of Progress Payments.” Each payment is stated in dollars and cents and specifically references the work or services to be performed and the materials and equipment to be supplied.

The contract also has to carry this statement, again in at least 12-point boldface type:

“The schedule of progress payments must specifically describe each phase of work, including the type and amount of work or services scheduled to be supplied in each phase, along with the amount of each proposed progress payment. IT IS AGAINST THE LAW FOR A CONTRACTOR TO COLLECT PAYMENT FOR WORK NOT YET COMPLETED, OR FOR MATERIALS NOT YET DELIVERED. HOWEVER, A CONTRACTOR MAY REQUIRE A DOWNPAYMENT.”

“One-third at cabinet install” does not describe a phase of work in dollars. It names a moment and a fraction. That is not a schedule.

Three ways to write the payments, side by side

Here is the same $48,000 kitchen, written three ways. Labels first, then the story of what the contractor actually did.

  • The way he wrote it. A third, a third, a third. Fits on a commercial subcontract where those rules do not apply. Does not fit a home improvement contract, because the first payment is over the cap and the second is not tied to work in dollars.
  • Down payment plus a real progress schedule. $1,000 at signing, then payments in dollars tied to demo, rough-in, inspection, drywall, cabinets delivered, cabinets installed, counters, and final. Fits almost every residential job. Does not fit if the contractor needs to fund a big material order with the owner’s money before that material is delivered.
  • Bond exemption. The contractor furnishes a qualifying bond or a joint control approved by the Registrar, covering full performance and payment. Fits an established contractor who does a lot of large residential work. Does not fit a new licensee, for a reason covered below.

The cabinet problem, and the honest fixes

The contractor’s real problem was not greed. It was cash flow. The cabinet shop wanted a big deposit to start building. He did not want to front that from his own account for a customer he had met twice.

He had a few legal options. None of them were “take a third up front anyway.”

Option one: tie a payment to delivered material. The statute’s word is “delivered.” Once the cabinets are delivered, a progress payment for their value can be earned under the schedule, even before they are hung. That does not fix the shop’s deposit, but it shortens how long the contractor carries it.

Option two: the owner buys the cabinets directly. Some homeowners order the cabinets themselves from the supplier, and the contractor’s contract covers installation only. Then the deposit is the owner’s deal with the shop, and the contractor’s contract price drops by that amount. The contract should say clearly that the cabinets are owner-furnished.

Option three: carry it, and price it in. Plenty of residential contractors simply finance material between delivery payments. They keep a line of credit or a supplier account for exactly this reason. That is a business choice, not a legal problem.

Option four: the bond exemption. This is the route that actually allows payment before completion. It is not available to everyone on day one.

Whatever he chose, the contract had to match it. A schedule that says “$1,000 at signing” and then quietly asks for $15,000 more before anything shows up at the house is the same violation with extra steps.

The bond exemption, and why it was not for him yet

Section 7159.5(a)(8) is the exception people half-remember. A contractor furnishing a performance and payment bond, a lien and completion bond, or a bond equivalent or joint control approved by the Registrar, covering full performance and payment, is exempt from paragraphs (3), (4), and (5). Those are the down payment cap, the payment schedule, and the earned-payment rule.

With that coverage in place, the contract also does not have to carry the down payment statement, the progress payment statement, or the Mechanics Lien Warning. The statute says a contractor furnishing those bonds or a Registrar-approved joint control may accept payment prior to completion.

If the contract uses joint control, the contractor may not have any financial or other interest in the joint control. The money has to be held by somebody independent.

Then the catch for our contractor. The same paragraph says a licensee shall be licensed in California in an active status for not less than two years before submitting an Application for Approval of Blanket Performance and Payment Bond. His B license was a few months old. The blanket bond route was not open to him yet.

That is worth remembering for the exam and for real life. The exemption exists. It has conditions. “I’ll just get bonded” is not a same-week fix for a new license.

Why the son told his mother to wait: the right to cancel

There was a second thing on the son’s mind. His mother had not signed yet. If she had, she would still have had time.

Under Section 7159(e)(6), most home improvement contracts must include a “Three-Day Right to Cancel” notice. For a buyer who is a senior citizen, the notice is the “Five-Day Right to Cancel,” and the wording changes from three business days to five. Civil Code Section 1689.5 defines a senior citizen as an individual who is 65 years of age or older. His mother was seventy-one. She would have had five business days.

The notice tells the buyer they can cancel by emailing, mailing, faxing, or delivering a written notice to the contractor’s place of business by midnight of the fifth business day after receiving a signed and dated copy of the contract that includes the notice. If the buyer cancels, the contractor must return anything paid within 10 days of receiving the notice of cancellation.

There are exceptions. The notice is not required when the contract is negotiated at the contractor’s place of business, among other cases. For contracts to repair or restore homes damaged in a declared emergency, there is a separate “Seven-Day Right to Cancel.”

The clock starts when the buyer receives a copy. Section 7159(c)(3)(A) says that before any work is started, the contractor shall give the buyer a copy of the contract signed and dated by both parties, and that the buyer’s receipt of that copy starts the cancellation rights under the Civil Code.

Put those together with the first payment line. If she had signed and handed over $16,000 that week, she could have cancelled inside her window and been owed the money back. A contractor who has already passed that money to a cabinet shop now has a problem that is entirely his own.

What the penalties actually are

This part makes new contractors sit up. A violation of the money rules is not only a contract dispute.

Section 7159.5(a) says failure to comply with its provisions is cause for discipline. That means CSLB can act against the license.

Section 7159.5(b) goes further. A violation of paragraph (1), (3), or (5) of subdivision (a) is a misdemeanor. Paragraph (1) is the written contract with the contract amount in dollars and cents. Paragraph (3) is the down payment cap. Paragraph (5) is the rule against payment beyond work performed or material delivered.

The misdemeanor is punishable by a fine of not less than $100 and not more than $5,000, or up to one year in county jail, or both. If the violation happens in a location damaged by a natural disaster with a declared state of emergency or major disaster, the statute says the court shall impose the maximum fine.

So “a third at signing” on a home improvement contract is not a negotiating point. It is the kind of line that can follow a license around.

The other things a home improvement contract has to say

The son did not stop at the payment lines. Once he knew what to look for, the three-page contract was missing most of what Section 7159 requires. Here is a short list of items he checked, all from Section 7159(c) through (e). It is not the whole statute.

  • The contractor’s name, business address, and license number.
  • The heading “Home Improvement,” in at least 10-point boldface type.
  • The “Contract Price” in dollars and cents.
  • A description of the project and of the significant materials to be used and equipment to be installed.
  • Approximate start date and approximate completion date, plus what counts as substantial commencement of work.
  • The change-order note. Extra work becomes part of the contract only once it is in writing and signed before that work starts.
  • The subcontractor checkbox. Yes or no, and if yes, the required disclaimer about providing a subcontractor list on request.
  • A notice that the owner may require a performance and payment bond, near the signatures.
  • Notices about commercial general liability insurance and workers’ compensation, each stating which situation applies.
  • The Mechanics Lien Warning, unless the bond exemption applies.
  • The CSLB information notice, in at least 12-point type.
  • The right-to-cancel notice and the “Notice of Cancellation” form, where required.

Then there are lien releases. Section 7159.5(a)(6) says that after any payment, and before any further payment, the contractor shall, if requested, obtain and furnish a full and unconditional release from any potential lien claimant for the portion of work that has been paid. The homeowner may withhold all further payments until those releases are furnished.

That rule pairs with the Mechanics Lien Warning. The warning tells homeowners that unpaid subcontractors and suppliers can record liens even if the owner has paid the contractor in full. The release rule gives the homeowner a tool to stop that from happening.

How the contract got rewritten

The contractor took the call well. The son was polite about it. He sent the two sections of the code, and a note that said, roughly, “My mom likes your plan. She just needs a contract that follows these.”

The contractor bought a proper home improvement contract form and rewrote the payment section. It ended up looking like this, in shape if not in exact numbers.

  • Down payment: $1,000, with the required bold statement next to it.
  • Demolition complete and debris hauled: a dollar amount matching that work.
  • Rough plumbing and electrical complete and inspected: a dollar amount.
  • Drywall complete: a dollar amount.
  • Cabinets delivered to the house: a dollar amount matching the cabinet material.
  • Cabinets installed: a dollar amount for the installation labor.
  • Countertops installed: a dollar amount.
  • Final completion and walk-through: the balance.

He covered the cabinet shop’s deposit from his supplier credit line and priced that cost into the job. The cabinets-delivered payment paid it back a few weeks later.

The homeowner signed the new contract at her kitchen table. She got her signed and dated copy, with the five-day notice and the cancellation form attached. She did not cancel. The kitchen got built.

The contractor said later that the rewrite cost him an evening and one awkward phone call. Getting it wrong could have cost him a lot more than that.

What to take into the exam room

If you are studying for the California Law and Business exam, here is what this story is really testing.

  • The down payment cap. $1,000 or 10 percent of the contract amount, whichever is less. Practice it on several prices until it is automatic.
  • The earned-payment rule. Except for the down payment, no payment beyond the value of work performed or material delivered. Lender advances count too.
  • The schedule. Progress payments are in dollars and cents and tied to specific work, services, materials, and equipment.
  • The bond exemption. Qualifying bonds or a Registrar-approved joint control lift the cap, the schedule rule, and the earned-payment rule. The blanket bond application needs two years of active licensure first.
  • The right to cancel. Three business days, or five for a buyer 65 or older, starting when the buyer receives the signed copy, with refunds due within 10 days of a cancellation notice.
  • The penalties. Cause for discipline, and a misdemeanor for violating the written-contract, down payment, or earned-payment rules.

Exam questions on this material often hand you a contract price and a payment term and ask whether it is allowed. If you can do the kitchen math above without looking, you are in good shape.

Studying it with us

Our California Law and Business prep course covers home improvement contracts, down payments, progress payments, lien releases, and the right to cancel, with practice questions built around situations like this one.

If you are working toward the license our contractor held, the California B General Building course covers the trade side of the exam. If your work is mostly residential plumbing, the California C-36 Plumbing course does the same for plumbing.

This post explains the statutes as written and is not legal advice. For a specific contract, read the current code sections, check CSLB’s guidance, and talk to a California construction attorney if the money is serious.

The son’s Sunday-night read took about twenty minutes. Learning these rules before your first residential contract takes about the same.