Skip to main content
Current codes Last updated September 21, 2026
Contractor exam prep in 45 states
Blog Contact

C-45 — Sign Installation

Current Status

Not Enrolled

Price

$99 – $169

Get Started

This course is currently closed

Buy access — see plans and pricing ›

Enroll

Same study guide and four exams. You are choosing how long you can log in.

📘 Download Your C-45 Study Guide PDF

Get the complete C-45 study guide as a downloadable PDF for offline review — same content as the lessons below, formatted for printing or tablet reading.

A C-45 Sign license authorizes fabricating, installing, and erecting both electrical signs — including their own wiring — and non-electrical signs, from pole-supported signs to wall-mounted and painted signage, under 16 CCR §832.45. It’s one of the few CSLB classes that bundles its own electrical scope into the definition, so a C-45 contractor doesn’t need a separate C-10 to wire the sign itself.

The C-45 trade exam is closed-book, multiple-choice, and administered by PSI, separate from the required Law and Business exam. CSLB’s own study guide weights the content as Sign Installation 26% (the largest section, including excavation and concrete footings for pole and monument signs), Planning and Estimating 22%, Sign Design and Fabrication 20% (including neon and LED/HID fabrication), Testing/Maintenance/Troubleshooting 16%, and Safety 16%.

Licensing requires four years of journeyman-level, foreman, or contractor experience in sign work within the last ten years, up to three of which can come from apprenticeship or trade school with at least one year hands-on. Every active license needs a $25,000 contractor’s bond (a separate $25,000 BQI bond for RMO arrangements or qualifiers under 10% ownership). The application fee is $450, plus $200–$350 for the initial license once you pass.

C-45 is easy to confuse with two neighbors: C-31 Construction Zone Traffic Control covers portable, temporary changeable-message signs, while C-45’s signs are permanent fixed infrastructure; and C-8 Concrete generally isn’t needed for small sign footings, since CSLB’s own study guide lists footing work under C-45’s own Sign Installation content area. Read the complete C-45 exam guide for the full requirements, exam breakdown, and FAQ.

Course Content

Start Here — How This Exam Is Built
Planning and Estimating — 22% of the Exam
Sign Design and Fabrication — 20% of the Exam
Sign Installation — 26% of the Exam
Testing, Maintenance, and Troubleshooting — 16% of the Exam
Safety — 16% of the Exam
Code Reference & General Knowledge
Exam Day
C-45 — Sign Installation — Exam 1
C-45 — Sign Installation — Exam 2
C-45 — Sign Installation — Exam 3
C-45 — Sign Installation — Exam 4