Georgia Electrical Contractor Exam Prep

Choose your access term

Your access starts when you do: the days begin the first time you open the course, not at checkout (or 14 days after purchase, whichever comes first).

Official sitting

Georgia Electrical Contractor exam at a glance

The Georgia Electrical Contractor exam has 162 questions and a time limit of 4 hours, and it is open book. That works out to about 1.5 minutes per question. Figures are from the official candidate bulletin, checked October 9, 2026.

Questions162
Time4 hours
BookOpen book

Confirm question count, time, open-book rules, and passing score on the live board bulletin before you sit. We do not guarantee a passing result. Source: PSI Candidate Information Handbook rev. 11/2024, bulletin 4736 posted 2026-01-23; reference list effective 1/1/2026-12/31/2026, checked October 9, 2026. How we source exam facts

All Georgia exams ›

What’s included

20,000+ word study guide

Worked calculations, code-section breakdowns, exam traps, a key-terms glossary and a 30/60/90-day plan.

4 full-length practice exams

Original questions weighted to match the topic mix of the real exam.

648 practice questions

Every one with a written explanation and the code section behind the answer.

Same study guide and four exams on every term. You are choosing how long you can log in.

Instant accessSecure checkoutBuilt on current codes
SKU: N/A Category:

What this prep covers

  1. About the Georgia Electrical Contractor license
  2. How Georgia licensing works
  3. Electrical theory and formulas the exam assumes
  4. How the NEC is organized (navigate it fast)
  5. Branch circuits, feeders, and load calculations (Article 220)
  6. Conductor ampacity and sizing (Article 310)
  7. Overcurrent protection (Article 240)
  8. Grounding and bonding (Article 250)
  9. Boxes, raceways, and wiring methods (Articles 300, 314, Chapter 9)
  10. Motors, transformers, and HVAC (Articles 430, 450, 440)
  11. Services and working clearances (Articles 230, 110, 408)
  12. GFCI, AFCI, and special locations
  13. Worked calculations
  14. Sample exam questions, solved
  15. Common mistakes and exam traps
  16. Key articles to tab
  17. Glossary of must-know terms
  18. Your 30 / 60 / 90 day study plan
  19. Exam-day strategy

Georgia Electrical Contractor licensing, explained

About the Georgia Electrical Contractor license

Georgia licenses electrical contractors through the State Board of Electrical Contractors, under the Georgia Secretary of State's Professional Licensing Boards Division. Unlike many states, Georgia does not issue a separate statewide journeyman or master electrician license — the state-level credential is the Electrical Contractor license itself, issued in two classifications: Class I (Restricted), limited to single-phase electrical installations not exceeding 200 amperes at the service drop or service lateral, and Class II (Unrestricted), which covers electrical contracting work of any type — residential, commercial, and industrial — with no amperage or voltage limit. A Class II holder can pull permits and serve as the qualifying agent for a licensed electrical contracting business anywhere in the state; a Class I holder is confined to the restricted scope above. (Some cities/counties issue their own local journeyman or master electrician cards for employees working under a licensed contractor — those are local credentials, not a state license tier, and don't substitute for the state Electrical Contractor license.)

The exam is open book, and the room is limited to the seven titles on the reference list effective January 1, 2026 through December 31, 2026. The code book on that list is the 2023 NEC or the NEC Handbook. Georgia's statewide minimum is the 2023 NEC with Georgia amendments effective January 1, 2026. Permanent tabs, highlighting, and underlining are what the handbook allows. Handwritten notes and pasted photocopies are not. The sitting card at the top of this guide names the other six books and the titles that stay outside.

Know these scope facts cold, because the exam asks them in plain-language form: the license is held by the individual, not the company; most installations require a permit and inspection before concealment (rough-in) and again at final; you must work within the classification you hold (Class I vs. Class II); and performing electrical work without the required license, or beyond your scope, is a violation that can cost you the license and carry civil penalties.

How Georgia licensing works

  • Experience: Rule 121-3-.01. The baseline is four years of primary experience in electrical installation. Secondary experience or education is credited for up to one year, at 50 percent. A two-year academic diploma, or a two-year vocational-technical certificate, can count as two years on that path. A four-year degree is not given four years of credit. The worked count is in the experience section later in this guide. Do not add an 8,000-hour figure or a required supervisory year the rule does not print.
  • Application: file in GOALS. The how-to guide lists a 110 dollar application fee, a background check from local law enforcement, three references (at least one from a licensed electrical contractor), and a secure and verifiable document. The board does not register companies. Approval to test is valid for one year.
  • Exam vendor: PSI, one class at a time. Class II (unrestricted), which this course trains, presents 162 questions: 140 scored plus 22 unscored beta items, in 4 hours (240 minutes). Eight hours is Class I and Class II with a break, not one Class II paper and not a separate business exam. Law and administration are 30 of the 140 scored items inside the same paper. The handbook passing line is a scaled score of 70, not 70 percent of 162.
  • Renewal: Rule 121-4-.05 requires 4 hours of continuing education per year in electrical contracting, 8 hours across a two-year renewal. It does not mandate a split between code hours and law hours. As of January 1, 2026 the hours are reported in CE Broker. The FAQ describes renewal in April through June of even-numbered years. Confirm the next window in GOALS.

Before you rely on any value in this guide, confirm the currently adopted NEC edition and amendments on the board and PSI bulletin. Ampacities, GFCI/AFCI scope, working-clearance distances, and receptacle-spacing rules all change between editions, and the exam is written to the edition Georgia has adopted — not necessarily the newest edition published.

This is the opening of the full study guide. The complete guide continues into code navigation, worked calculations and solved exam questions.

Common questions about this exam

How many questions are on the Georgia Electrical Contractor exam?

The Georgia Electrical Contractor exam has 162 questions and a time limit of 4 hours, about 1.5 minutes per question. It is open book. Check the current board bulletin before you book.

How much practice does this prep include?

It includes 4 full-length practice exams and 648 practice questions in total. Every question has a written explanation naming the code section the answer comes from.

How long is the study guide?

The Georgia Electrical Contractor guide runs to roughly 20,960 words in 19 sections, starting with “About the Georgia Electrical Contractor license” and ending with “Exam-day strategy”.

How long do I get access?

Choose 30, 60 or 90 days at checkout. Your days do not start at checkout: they begin the first time you open the course (or 14 days after purchase, whichever comes first). Access works on any device, and you can retake every practice exam as often as you like. Days remaining are shown in your dashboard and you can extend at any time.

Is this an official Georgia Electrical Contractor exam?

No. This is independent preparation material. It is not affiliated with or endorsed by any state licensing board or exam vendor, and it does not contain real exam questions. Always confirm current requirements with your licensing board.

About this prep

This prep is built specifically for the Georgia Electrical Contractor examination and includes a 20,000+-word study guide written for this exam, 4 full-length practice exams and 648 practice questions, each with a written explanation.

How access works

You are paying for access length (30, 60, or 90 days). The study guide and four timed exams are the same on every term. Your days start the first time you open the course, not at checkout (or 14 days after purchase, whichever comes first), and access works on any device for that term.

Not affiliated with or endorsed by any state licensing board or exam vendor. For exam-preparation purposes only.