What’s included

19,000+ word study guide

Worked calculations, code-section breakdowns, exam traps, a key-terms glossary and a 30/60/90-day plan.

4 full-length practice exams

Original questions weighted to match the topic mix of the real exam.

320 practice questions

Every one with a written explanation and the code section behind the answer.

Same study guide and four exams on every term. You are choosing how long you can log in.

Instant accessSecure checkoutBuilt on current codes
SKU: N/A Category:

What this prep covers

  1. About the Montana Master Electrician license
  2. How Montana licensing works
  3. Electrical theory and formulas the exam assumes
  4. How the NEC is organized (navigate it fast)
  5. Branch circuits, feeders, and load calculations (Article 220)
  6. Conductor ampacity and sizing (Article 310)
  7. Overcurrent protection (Article 240)
  8. Grounding and bonding (Article 250)
  9. Boxes, raceways, and wiring methods (Articles 300, 314, Chapter 9)
  10. Motors, transformers, and HVAC (Articles 430, 450, 440)
  11. Services and working clearances (Articles 230, 110, 408)
  12. GFCI, AFCI, and special locations
  13. Worked calculations
  14. Sample exam questions, solved
  15. Common mistakes and exam traps
  16. Key articles to tab

…and 3 further sections in the full guide.

Montana Master Electrician licensing, explained

About the Montana Master Electrician license

Montana licenses electricians through the Montana State Electrical Board. The Master Electrician is the senior credential. Unlike many states, Montana does not require you to already hold a Montana journeyman license to sit for the master exam — you qualify by documented experience or an engineering-degree path instead. Specifically, you need either 8,000 hours of legally obtained journeyman-level experience in planning, laying out, or supervising the installation and repair of wiring, apparatus, or equipment for electrical light, heat, and power (not more than 50 percent residential; ARM 24.141.515 allows that experience to be commercial, residential, industrial, institutional, or a combination), or an electrical engineering degree from an accredited college or university plus 2,000 hours of practical experience (MCA 37-68-304; ARM 24.141.515). You then pass a more demanding exam that adds heavier load-calculation, design, and code-application content. A holder at this level can typically pull permits, supervise journeymen and apprentices, design installations, and serve as the qualifying individual for a licensed contracting business.

The exam is National Electrical Code (NEC) based, because Montana adopts the NEC as its electrical code. It is open book. The 2020 master block of the PSI bulletin updated 6/21/2022 names three references: the 2020 NEC, with factory markings, factory highlights, and factory tabs only on that line; the print-reading book based on the 2020 NEC published by American Technical Publishers; and the Montana Building Codes Amendments. A later sentence in the same PDF says books must be unmarked and that marking is reported to a board that is not the Montana Electrical Board. Do not obey that leftover sentence as if it were Montana. ARM 24.141.503 allows highlights, underlining, and notes in the materials the rule permits. The morning you sit, follow the reference line that names the 2020 NEC. Plan to tab and index your code book before test day, because the exam is as much a test of how fast you can locate a section as it is of what you have memorized.

Know these scope facts cold, because the exam asks them in plain-language form: the license is held by the individual, not the company; most installations require a permit and inspection before concealment (rough-in) and again at final; you must work within the classification you hold; and performing electrical work without the required license, or beyond your scope, is a violation that can cost you the license and carry civil penalties.

How Montana licensing works

  • Experience: 8,000 hours of documented journeyman-level experience (no more than 50 percent residential), or an accredited electrical engineering degree plus 2,000 hours of practical experience — see Section 1.
  • Proof: the board checklist asks a third party to verify the 8,000 journeyman-level hours. On the degree path, transcripts come from the school and may be sent to dlibsdhelp@mt.gov. Montana does not require a Montana journeyman card before this exam.
  • Application: submit the application, fees, and proof of experience (verified by an employer or corporate officer, not the applicant) to the board before you are approved to sit.
  • Exam vendor: PSI. The exam is 80 questions covering the NEC and Montana's electrical laws and board rules (Title 37, MCA), and the passing score is 75 percent (60 of 80 correct), and the same bulletin gives this paper 240 minutes. ARM 24.141.503 agrees with the 75 percent master cut. The 2020 journeyman block in that bulletin is 60 questions and 180 minutes and is not this exam.
  • Renewal: ARM 24.141.2102 renews the license on July 15 of even-numbered years. The continuing-education total is 16 hours, and at least 8 of those hours are NEC updates.

Before you rely on any value in this guide, confirm the currently adopted NEC edition on the board and PSI bulletin. Ampacities, GFCI/AFCI scope, working-clearance distances, and receptacle-spacing rules all change between editions, and the exam is written to the edition your state has adopted — not necessarily the newest one published.

This is the opening of the full study guide. The complete guide continues into code navigation, worked calculations and solved exam questions.

Other Montana exam prep

Montana Master Electrician exam — common questions

Who administers the Montana Master Electrician exam?

The Montana Master Electrician is administered by PSI Montana electrician CIB updated 6/21/2022, read 2026-10-04. Master Electrician 2020: 80 questions, 240 minutes, 75 percent, open book. Headings: NEC, general trade knowledge and theory, major load calculations. References: NEC 2020 (factory markings, factory highlights, factory tabs on that line), ATP print-reading book based on the 2020 NEC, Montana Building Codes Amendments. A later unmarked-book sentence names the BCC, not the Montana board. ARM 24.141.503 agrees at 75 percent for master. Journeyman in the same bulletin is 60/180 and is not this paper. MCA 37-68-304 at least 80 questions. Bulletin fee $85..

How many questions are on the Montana Master Electrician exam?

The exam contains 80 questions. You need 75% to pass. You are allowed 4 hours.

How much practice does this prep include?

It includes 4 full-length practice exams and 320 practice questions in total. Every question has a written explanation naming the code section the answer comes from.

How long is the study guide?

The Montana Master Electrician guide runs to roughly 19,393 words, covering 19 sections from licensing rules through worked calculations and solved exam questions.

How long do I get access?

Choose 30, 60 or 90 days at checkout. Access begins the moment you enrol, works on any device, and you can retake every practice exam as often as you like. Days remaining are shown in your dashboard and you can extend at any time.

Is this an official Montana Master Electrician exam?

No. This is independent preparation material. It is not affiliated with or endorsed by any state licensing board or exam vendor, and it does not contain real exam questions. Always confirm current requirements with your licensing board.

About this Montana Master Electrician prep

This prep is built specifically for the Montana Master Electrician examination and includes a 19,000+-word study guide written for this exam, 4 full-length practice exams and 320 practice questions, each with a written explanation.

The Montana Master Electrician is administered by PSI Montana electrician CIB updated 6/21/2022, read 2026-10-04. Master Electrician 2020: 80 questions, 240 minutes, 75 percent, open book. Headings: NEC, general trade knowledge and theory, major load calculations. References: NEC 2020 (factory markings, factory highlights, factory tabs on that line), ATP print-reading book based on the 2020 NEC, Montana Building Codes Amendments. A later unmarked-book sentence names the BCC, not the Montana board. ARM 24.141.503 agrees at 75 percent for master. Journeyman in the same bulletin is 60/180 and is not this paper. MCA 37-68-304 at least 80 questions. Bulletin fee $85.. This prep is written to that board’s current scope, not to a generic national syllabus.

The real Montana Master Electrician exam contains 80 questions, with a passing score of 75%. Our practice exams mirror that structure so the format is familiar before you sit it.

Topics covered

  • About the Montana Master Electrician license
  • How Montana licensing works
  • Electrical theory and formulas the exam assumes
  • How the NEC is organized (navigate it fast)
  • Branch circuits, feeders, and load calculations (Article 220)
  • Conductor ampacity and sizing (Article 310)
  • Overcurrent protection (Article 240)
  • Grounding and bonding (Article 250)
  • Boxes, raceways, and wiring methods (Articles 300, 314, Chapter 9)
  • Motors, transformers, and HVAC (Articles 430, 450, 440)
  • Services and working clearances (Articles 230, 110, 408)
  • GFCI, AFCI, and special locations
  • Worked calculations
  • Sample exam questions, solved
  • Common mistakes and exam traps
  • Key articles to tab
  • Glossary of must-know terms
  • Your 30 / 60 / 90 day study plan
  • Exam-day strategy

How access works

You are paying for access length (30, 60, or 90 days). The study guide and four timed exams are the same on every term. Access starts when you enrol and works on any device for that term.